The Foundation Schedule Sets the Tone
When foundations slow down, everything behind them feels it: concrete, steel, framing, MEP rough-in, and
turnover. Fuller Pile® is built for projects where schedule matters, especially sites that need deep foundation
performance without the disruption of traditional driven piles or spoil-heavy drilled systems.
Small Equipment, Big Production
Fuller Pile® installation uses compact, CAT-class equipment with auger attachments. That smaller footprint can
improve access, reduce jobsite congestion, and allow multiple rigs to work at once when the schedule demands it.
For general contractors, that means a foundation plan that can scale instead of becoming a bottleneck.
Less Time Lost to Spoils and Site Disruption
Because Fuller Pile® is installed using controlled displacement, the process can avoid the spoil generation
common with many drilled systems. Less spoil means fewer trucks, less disposal coordination, and less risk of
delays tied to contaminated or difficult-to-handle soils. It also helps keep active jobsites cleaner and easier to
coordinate.
Real Project Momentum
Claycor’s project history shows how speed can translate into real schedule value. Examples include 210 FP450
Fuller Piles installed in one week at the ROPER Sawmill project, 10 FP450 Fuller Piles completed in two days
including mobilization for the Ravenel Bridge stair tower work, and large rigid inclusion packages installed across
major commercial and public projects.
Fast Does Not Mean Loose
Speed only matters if quality stays controlled. Fuller Pile® projects can include delegated design, installation
monitoring, grout volume records, load testing, and as-built documentation as required by the project. That
combination is what makes the system attractive: fast installation with engineering discipline behind it.